The employer operating the Tower Crane shall ensure the submission of a Thorough Examination Report compiled by a competent person once in every period of twelve (12) months, in the case where the Tower Crane with its attachments is used to lift persons, they shall be Thoroughly Examined at least once in every period of six (6) months, as required by S.L. 646.24 - Work Equipment (Minimum Safety and Health Requirements) Regulations. Please fill in the online form to submit to the OHSA.
A copy of the examination report shall accompany the lifting machine at the workplace where it is being used and it shall be kept available for inspection.
Fill in the online form to submit to the OHSA: Tower Crane Certification